Installation & Operations Timeline

Timelines vary by deployment combination. Below are typical schedules for each, starting with our recommended configuration.

B + A: Remote Compute + HYDRA Network (Recommended)

Lightest footprint. Minimal venue hardware.

Phase Duration Activities
Pre-Installation 1–2 weeks Bandwidth test, confirm ethernet handoff, firewall rules
Day 1: Setup ~3 hours Mount AP, deploy router, connect to venue ethernet, establish VPN
Day 1: Testing & Handoff ~3 hours Remote link validation, VR streaming quality check, handoff

B + B: Remote Compute + Venue Network

Remote compute, venue handles networking.

Phase Duration Activities
Pre-Installation 1–2 weeks VLAN provisioning, bandwidth test, API credential exchange
Day 1: Setup ~2 hours Mount AP, connect to venue VLAN, establish VPN to remote compute
Day 1: Testing & Handoff ~3 hours Remote link validation, VR streaming quality check, handoff

A + A: On-Site Compute + HYDRA Network

Heaviest footprint. Full stack on-site.

Phase Duration Activities
Pre-Installation 2–4 weeks Site survey, network planning, confirm checklist items
Day 1: Physical Setup ~4 hours Rack compute and network gear, mount AP, run cables, connect power
Day 1: Network Config ~2 hours Router setup, VLAN config, AP configuration, wired clients
Day 2: Calibration ~3 hours VR streaming validation, latency checks, signal coverage
Day 2: Handoff ~1 hour Staff walkthrough, documentation, remote access confirmed

A + B: On-Site Compute + Venue Network

Compute on-site, integrated into venue network.

Phase Duration Activities
Pre-Installation 2–4 weeks VLAN provisioning, API credential exchange, site survey
Day 1: Physical Setup ~3 hours Install compute, mount AP, connect to venue network
Day 1: Config & Test ~3 hours AP configuration, VLAN verification, QoS testing
Day 2: Calibration & Handoff ~3 hours VR validation, documentation, remote access

Timelines may vary based on venue complexity and readiness of checklist items.


Staffing an Exhibitor Floor

For an event where exhibitors supply the equipment, fault arrivals are heavily front-loaded. Measured over 16 days on a 280-stand expo in October 2026, 197 floor reports in total:

Period Reports Share
Day 1 37 19%
Day 2 37 19%
Days 3 to 7 69 35%
Days 8 to 16 54 27%

That is 37 reports a day while the floor settles, against 6 a day in the second week. Staff the first two days for roughly six times the later rate.

The work also concentrates on few stands. 44 of the 280 stands produced 73 per cent of the reports, and 31 of those 44 were first reported on day one or day two. Build the watch list on the evening of day two from the reports already filed: half of every report that came later came from a stand that was already on it.

Operational guidance for the floor is in exhibitor-floor.md.

Ongoing Operations

All deployment types benefit from the following post-installation practices. The scope depends on the deployment duration.

Activity Events Temporary Exhibitions Permanent Installations
Remote monitoring and management During operation Throughout exhibition run Continuous
Hardware lifecycle and replacement N/A As needed Scheduled replacement cycles
Scheduled maintenance windows N/A Coordinated with venue Monthly or quarterly
Scaling (adding/removing headsets, bodies, displays) Pre-planned As exhibition evolves On demand

Decommissioning

When a deployment ends: