Please confirm the items relevant to your deployment combination. Items are tagged by which decision they apply to.
Tags: ALL = all deployments | ON-SITE = on-site compute | REMOTE = remote compute | VENUE NET = venue network | HYDRA NET = HYDRA-supplied network | PERMANENT = permanent installations
ALL Power outlets within 5 m of installation locationALL Ceiling or pole mounting point for access point (3–4 m height, centered)ALL Cable pathway from network gear to AP mounting pointALL Ethernet runs to each display/receiver workstation locationALL Display screens available or procurement confirmedALL Outbound UDP and HTTPS traffic permitted (for WireGuard VPN)ALL Venue IT contact assigned for installation day coordinationON-SITE Floor space or 19U rack for HYDRA Body compute unitsON-SITE Dedicated power circuit for compute (1 kW per unit)REMOTE Wired internet with minimum 100 Mbps (200 Mbps preferred) downstream per VR headset confirmedREMOTE Bandwidth test completed and results shared with HYDRA teamVENUE NET Dedicated VLAN provisioned for HYDRA devicesVENUE NET API credentials provided for programmatic VLAN managementVENUE NET QoS / DSCP marking configured for VR traffic prioritizationVENUE NET Firewall rules: allow local LAN traffic between HYDRA devicesHYDRA NET Ethernet uplink handoff location confirmedHYDRA NET 6U rack space or table/shelf for HYDRA network equipmentPERMANENT Maintenance access schedule agreed (monthly/quarterly)PERMANENT Hardware replacement and escalation process documentedPERMANENT Remote management access confirmed (VPN, SSH)