HydraVenues

Getting Started Overview

Power & Physical Infrastructure

Power Requirements

Component Power Draw Notes
HYDRA Body (compute) 1 kW per unit Dedicated circuit recommended, on-site compute only
Access Point (via PoE) 25.5 W per AP Provided through PoE+ switch
Receiver Workstations 150 W per unit Mac Mini ~40 W; Dell ~150 W
Display Screens Per manufacturer spec
Total (on-site compute) ~1.5 kW per single-field deployment Excluding displays
Total (remote compute) ~200 W per field AP + switch + workstations only

Rack & Mounting

Component Requirement
Network Gear 6U rack space (router, switch, PoE injector), HYDRA-supplied network only
Compute (if racked) 19U rack, 24-inch depth minimum, on-site compute only
Compute (standalone) HYDRA Body can be placed on floor or table
Remote Compute No rack or floor space required for compute
AP Mounting Non-metallic pole or ceiling mount, adjustable 3–4 m, centered over play area
Cable Pathway CAT6a from network gear to AP mount point; ethernet to each workstation

Play Area

Attribute Requirement
Dimensions Up to 16 m diameter (200 m²) per field
Floor Surface Flat, hard surface (no deep carpet)
Ceiling Height 4 m minimum clearance
Lighting 500–750 lux, 4000–5000 K color temperature, uniform, non-flickering
Line of Sight Clear path from AP to all play positions (no obstructions above head height)

Exhibitor-Supplied Equipment

Measured on a 280-stand expo in October 2026, where most equipment belonged to exhibitors. Three power-related causes accounted for a large share of repeat faults, and all three are settled before the doors open rather than during the run.

Finding What to do
Displays and computers left in standby or sleep went dark during opening hours, and one computer slept every 15 minutes Disable standby and sleep at the device. Do not work around it each morning
A stand whose power cable was within visitor reach was reported repeatedly, because the computer dropped out whenever the cable was touched Strain-relieve and route out of reach; treat a reachable cable as a defect
One installation required all three of its display cables to be seated before the computer was given power, in that order Record the cabling order per stand where it matters

A stand with its own computer is a single point of failure that no UPS of ours covers. Where the installation matters, ask the exhibitor for a UPS on their own equipment, or expect the stand to drop with the circuit.